Scope and delivery

Granny flat quote comparison: put scope beside the price

A granny flat quote comparison begins with the deliverable. Two totals can describe different buildings, different site assumptions or different stages of completion. Put the scope beside the price so the comparison survives contact with the actual site.

By Yan Zhu · Co-Founder & Chief Data Officer
Published and reviewed ·

Image from the E2ES build gallery. It illustrates construction and is not a sold-property comparable.

Victoria · original decision guidance

Examples describe how to assess evidence. Planning, building, title, service and operating requirements need separate project checks. Research filters describe a chosen product; they do not define a legal category.

Ask each builder to price the same current brief

Use one drawing revision, one specification and the same owner requirements. Include the bathroom arrangement, laundry, appliances, heating, storage and finishes you expect. If one quote prices a different layout, identify that difference before debating its total.

Keep a quote register showing the date, validity period, drawing revision and exclusions. When the brief changes, ask for a revised quote or a clearly identified adjustment. A later email should not silently replace the scope attached to an earlier number.

Building contracts checklist

Build a responsibility matrix for the whole project

For each work item, record whether it is included, an allowance, excluded, owner-supplied or awaiting information. Include demolition, foundation preparation, service trenching, switchboard work, paths, fences, landscaping, waste removal and reinstatement where relevant. Blank cells are unresolved scope, not free work.

Specify the starting and finishing point of each item. “Sewer connection” can leave open the route, tie-in, authority process and reinstatement. “Site access” can leave open whether fences are removed and who restores them. The matrix should identify the party completing each interface.

Separate a selected item from an uncertain quantity

Consumer Affairs Victoria distinguishes prime cost items, involving selections not finally identified and costed, from provisional sums for work whose cost is still estimated. Ask what each allowance covers and what evidence will make it final.

Keep your comparison on the same basis: item, allowance, assumed quantity, excluded components and adjustment method. Do not simply add an arbitrary contingency to one builder and leave another unchanged. Track the specific unresolved items so the budget can improve as the evidence improves.

Building contracts checklist

Make the price basis and completion point visible

Check whether each quoted amount includes GST and whether costs paid directly by the owner sit outside it. Identify which inspections, documents, connections and practical tasks remain before the dwelling can be used as intended. The relevant permit determines the completion documentation required.

Separate the building quote from the project budget. Adviser fees, owner works, financing costs and operating setup may have different suppliers and dates. A quote can be internally accurate while still representing only part of the cash commitment.

At the end of your building project

Compare how unresolved items will be closed

Ask who obtains missing information, when a decision is required and how a change affects the scope, price and programme. A clear route to closing uncertainty is useful evidence when comparing offers; an unsupported promise that nothing will change is not.

For a proposed variation, keep the reason, current and revised scope, cost and timing together. CAV provides guidance on written changes to major domestic building contracts. Get the project-specific terms reviewed before relying on an informal message as authority to proceed.

Changing a major domestic building contract

Documents to take to the next conversation

  • The same drawing revision and specification attached to every quote.
  • An item-by-item inclusion, allowance, exclusion and responsibility matrix.
  • GST basis, owner-paid costs and the intended completion point.
  • Open questions with evidence required, owner and due date.

Questions owners ask

Is the lowest granny flat quote necessarily the cheapest project?

The total alone cannot answer that. Compare the same design, included site and service work, allowances, owner-paid items and completion point.

How should I compare provisional sums?

Compare what each sum covers, the quantity and site assumptions, excluded components and adjustment method. Identify which record will resolve the uncertainty.

Sources and further reading

Cite this guide

Yan Zhu. E2ES. Granny flat quote comparison: put scope beside the price. 2026-10-09.

https://e2es.com.au/construction-evidence/granny-flat-quote-scope-comparison

Original text: CC BY 4.0 with attribution. Gallery photographs and linked material retain their existing rights; they are outside this text licence.

Related decisions

Explore Development Insights

Compare product-specific market evidence on PremiumREA. Check the current filters, dates and sample size before using a result.

Explore Development Insights

Bring the evidence into your site review

Share the site records and unresolved scope questions so the next step starts with a clear brief.