One-Stop Service
Six stages. One team.
From the first site visit to monthly rent statements — E2ES is the single point of responsibility. No hand-offs between builder, town planner, leasing agent and property manager. One contract. One invoice path. One team to call.
Site Assessment
1–2 weeks
Free on-site visit. Council check, overlays, setbacks, soil & service locations. We tell you in writing whether your lot works — before any contract.
Design & Working Drawings
2–3 weeks
Pick one of our three layouts. We adapt siting, orientation and facade to your lot and produce Australian-standard working drawings.
Permits & Approvals
4–8 weeks
We lodge and chase the planning + building permit end-to-end. Owner has zero paperwork. Most builds are Class 1a on single lots, no subdivision.
Construction
12–16 weeks
One fixed-price contract. One site supervisor. Weekly photo updates via the owner portal. Finishes locked in at contract signing — no variation upsells.
Leasing
2–3 weeks
Our leasing team begins advertising 5 days before handover. 4-point tenant screening, 48-hour application turnaround. Bills-included strategy where it maximises return.
Ongoing Management
Forever, if you want
Hand it off to OptimaRea — the same team that built the flat now manages it. 1:50 manager ratio, Tapi AI for 24/7 maintenance, quarterly inspections.
01
Site Assessment
1–2 weeks
Free on-site visit. Council check, overlays, setbacks, soil & service locations. We tell you in writing whether your lot works — before any contract.
02
Design & Working Drawings
2–3 weeks
Pick one of our three layouts. We adapt siting, orientation and facade to your lot and produce Australian-standard working drawings.
03
Permits & Approvals
4–8 weeks
We lodge and chase the planning + building permit end-to-end. Owner has zero paperwork. Most builds are Class 1a on single lots, no subdivision.
04
Construction
12–16 weeks
One fixed-price contract. One site supervisor. Weekly photo updates via the owner portal. Finishes locked in at contract signing — no variation upsells.
05
Leasing
2–3 weeks
Our leasing team begins advertising 5 days before handover. 4-point tenant screening, 48-hour application turnaround. Bills-included strategy where it maximises return.
06
Ongoing Management
Forever, if you want
Hand it off to OptimaRea — the same team that built the flat now manages it. 1:50 manager ratio, Tapi AI for 24/7 maintenance, quarterly inspections.
What you receive at each stage
Full transparency, every step.
- ·Feasibility memo
- ·Lot suitability score
- ·Indicative rent + yield
- ·Fixed-price quote
- ·Site plan + floor plan
- ·Elevations & sections
- ·Energy rating (6 Star)
- ·3D render preview
- ·Town planning (if required)
- ·Building permit
- ·Soil report + engineering
- ·CFA / water authority sign-off
- ·Slab → frame → lockup → fitout
- ·Weekly progress photos
- ·Final inspection + occupancy
- ·Defect liability period
- ·Professional photos
- ·realestate.com.au listing
- ·Open inspections
- ·Lease signed & bond lodged
- ·Rent collection + statements
- ·Routine + annual inspections
- ·Maintenance dispatch
- ·VCAT representation