Permit, build, lease — all under one contract.
Target Rent
$380 / wk
Build Window
4 weeks on site
Floor Plan


Three Proven Layouts
Pick the floor plan.
We handle everything else.
Every E2ES granny flat is built from one of three field-tested designs — refined across 300+ dual-occupancy projects in Melbourne. Fixed prices. Fixed 2-month timeline: 1 month of paperwork, 1 month on site. The best Australian-made materials — BlueScope Colorbond, James Hardie, CSR Bradford — on an engineered concrete slab, never steel stumps.
Rent figures are indicative ranges from comparable E2ES-built dwellings in Melbourne metro — not a forecast. Actual rent depends on suburb, finish, market conditions and tenant demand. All plans are Class 1a compliant on suitable lots.
One-Stop Service
Six stages. One team.
From the first site visit to monthly rent statements — E2ES is the single point of responsibility. No hand-offs between builder, town planner, leasing agent and property manager. One contract. One invoice path. One team to call. And a timeline nobody else in Melbourne publishes: 1 month of paperwork + 1 month of construction — 2 months from your decision to a finished build.
Site Assessment
1–2 weeks
Free on-site visit. Council check, overlays, setbacks, soil & service locations. We tell you in writing whether your lot works — before any contract.
Design & Working Drawings
Weeks 1–2 · paperwork month
Pick one of our three layouts. We adapt siting, orientation and facade to your lot and produce Australian-standard working drawings. Because the three designs are pre-engineered, drawings that take other builders a month are done in days.
Permits & Approvals
Weeks 2–4 · paperwork month
We lodge and chase the building permit end-to-end via our private surveyor — owner has zero paperwork. Under Victoria's small second dwelling reform (Amendment VC253), most lots need no planning permit at all, so the whole paperwork stage closes in ~1 month. Overlay sites (heritage, bushfire, flood) are flagged in writing before contract.
Construction
4 weeks on site
One fixed-price contract. One site supervisor. Pre-cut frames and a rehearsed 4-week site sequence on an engineered concrete slab — the same three designs, built hundreds of times, is why one month on site is enough. Finishes locked at signing, no variation upsells.
Leasing
2–3 weeks
Our leasing team begins advertising 5 days before handover. 4-point tenant screening, 48-hour application turnaround. Bills-included strategy where it maximises return.
Ongoing Management
Forever, if you want
Hand it off to OptimaRea — the same team that built the flat now manages it. 1:50 manager ratio, Tapi AI for 24/7 maintenance, quarterly inspections.
01
Site Assessment
1–2 weeks
Free on-site visit. Council check, overlays, setbacks, soil & service locations. We tell you in writing whether your lot works — before any contract.
02
Design & Working Drawings
Weeks 1–2 · paperwork month
Pick one of our three layouts. We adapt siting, orientation and facade to your lot and produce Australian-standard working drawings. Because the three designs are pre-engineered, drawings that take other builders a month are done in days.
03
Permits & Approvals
Weeks 2–4 · paperwork month
We lodge and chase the building permit end-to-end via our private surveyor — owner has zero paperwork. Under Victoria's small second dwelling reform (Amendment VC253), most lots need no planning permit at all, so the whole paperwork stage closes in ~1 month. Overlay sites (heritage, bushfire, flood) are flagged in writing before contract.
04
Construction
4 weeks on site
One fixed-price contract. One site supervisor. Pre-cut frames and a rehearsed 4-week site sequence on an engineered concrete slab — the same three designs, built hundreds of times, is why one month on site is enough. Finishes locked at signing, no variation upsells.
05
Leasing
2–3 weeks
Our leasing team begins advertising 5 days before handover. 4-point tenant screening, 48-hour application turnaround. Bills-included strategy where it maximises return.
06
Ongoing Management
Forever, if you want
Hand it off to OptimaRea — the same team that built the flat now manages it. 1:50 manager ratio, Tapi AI for 24/7 maintenance, quarterly inspections.
What you receive at each stage
Full transparency, every step.
- ·Feasibility memo
- ·Lot suitability score
- ·Indicative rent + yield
- ·Fixed-price quote
- ·Site plan + floor plan
- ·Elevations & sections
- ·Energy rating (6 Star)
- ·3D render preview
- ·Small-second-dwelling check (VC253)
- ·Building permit
- ·Soil report + engineering
- ·CFA / water authority sign-off
- ·Slab → frame → lockup → fitout
- ·Weekly progress photos
- ·Final inspection + occupancy
- ·Defect liability period
- ·Professional photos
- ·realestate.com.au listing
- ·Open inspections
- ·Lease signed & bond lodged
- ·Rent collection + statements
- ·Routine + annual inspections
- ·Maintenance dispatch
- ·VCAT representation
Free Site Assessment
Start with a
30-minute site visit.
Tell us your address and which of the three plans you're drawn to. We'll review council overlays, confirm feasibility, and come back with a fixed-price quote, indicative rent and yield — all in writing, no obligation.
Sales & Feasibility
+61 480 099 909
hello@e2es.com.au
Office
Suite 631, Waterman Workspace, 44 Lakeview Drive, Scoresby VIC 3179